Wednesday 3 January 2018

4
Sr. No.
Item
Details
12
Village
panchayats,
Zilla
parishad, Municipal corporation,
local body (complete postal
addres
ses with telephone nos. to
be given)
Paloncha (Village & Mandal), Khammam
district
-
507 115.
Ph No: 08744
-
255275, Fax No: 08744
-
255272
13
Name of the applicant
Andhra Pradesh Power Generation Corporation
Limited
14
Registered Address
Chief Engineer/Civi
l/General Services
Room No.107, ‘A’ Block, APGENCO, Vidyut
Soudha, Hyderabad
-
500 082
Ph.No.
: 040
-
23499413/23499453
Fax: 040
-
23302883
15
Address for correspondence
Chief Engineer/Civil/General Services
Room No.107, ‘A’ Block, APGENCO, Vidyut
Soudha,
Hyderabad
-
500 082
Ph.No
: 040
-
23499413/23499453
Fax: 040
-
23302883
Name
Smt. V. Surya lakshmi
Designation
(Owner/Partner/CEO)
Chief Engineer/Civil/General Services
Address
Chief Engineer/Civil/General Services
Room No.107, ‘A’ Block, APGENCO, V
idyut
Soudha, Hyderabad
-
500 082
Ph.No
: 040
-
23499413/23499453
Fax: 040
-
23302883
Pin Code
500 082
E
-
mail
environment_apgenco@yahoo.co.in
Telephone No.
040
-
23499413/23499453
Fax No.
040
-
23302883
16
Details of Alternative Sites
examined, if
any. Location of
these sites should be shown on a
toposheet.
The proposed project is an expansion.
17
Interlinked Projects
No
18
Whether separate application of
interlined project has been
submitted
Not Applicable
19
If yes, date of submission
20
If no, re
ason
Not Applicable
21
Whether the proposal involves
approval/clearance under:
(a)
The Forest (Conservation)
Act, 1980
(b)
The Wildlife (Protection) Act,
1972
(c)
The C.R.Z Notification, 1991
--
No
No
22
Whether
there
is
any
Government
Order/
Policy
relevant/relati
ng to the site
No
23
Forest land involved (hectares)
Nil
5
Sr. No.
Item
Details
24
Whether there is any litigation
pending against the project and/
or land in which the project is
propose to be set up
(a)
Name of the Court
(b)
Case No.
(c)
Orders/ directions of the
Court, if any and its
relev
ance with the proposed
project.
No
(II) Activity
1)
Construction, operation or decommissioning of the project involving actions,
which will cause physical changes in the locality (topography, land use, changes
in water bodies, etc.)
Sl.
No
Information/Chec
klist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible) with
source of information data
1.1
Permanent or temporary change
in land use, land cover or
topography including increase
in intensity of land use (w
ith
respect to local land use plan)
-
The proposed
1 X 800 MW Supercritical
Coal based Thermal Power plant
is an
extension to the existing plant. The
requirement of land will be much less due
to integration of facilities like coal
handling & water sy
stems with the other
stages of the plant.
137 acres of existing land will be used for
main plant and other facilities. Additional
230 acres will be acquired for ash pond for
existing and the proposed plants
.
1.2
Clearance of existing land,
vegetation a
nd buildings?
Yes
The existing vacant land will be levelled
and graded.
1.3
Creation of new land uses?
Yes
137 acres of existing land will be used for
main plant and other facilities. Additional
230 acres will be acquired for ash pond
for existing and
the proposed plants.
1.4
Pre
-
construction investing
-
ations
e.g. bore holes, soil testing?
No
Geological investigations will be Carried
out
1.5
Construction works?
Yes
Boiler, Turbine, Generator, Condenser,
Cooling water system, Coal handling
system,
Ash handling system, Coal plant,
ESPs, Switchyard and other civil,
mechanical and electrical plant and
equipment.
1.6
Demolition works?
No
---
6
1.7
Temporary sites used for
construction works or housing
of construction workers?
No
Temporary sites u
sed for construction
works or housing of construction
workers are not required as majority of
labour will be hired from nearby areas.
1.8
Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes
As me
ntioned in the item 1.5
1.9
Underground works including
mining or tunneling?
No
Coal conveying belts, water transport
lines etc.
1.10
Reclamation works?
No
Not applicable
1.11
Dredging?
No
Not applicable
1.12
Offshore structures?
No
Not applicable
1.
13
Production and manufacturing
processes?
Yes
Coal received from the mines at (
-
)100
mm size is crushed in the crusher house
to (
-
)20 mm size, which is further
powdered in the coal mills. The
powdered coal is burnt in the furnace to
generate steam in th
e boiler. The steam
generated in the boiler is expanded in the
HP & LP turbines and power is generated
in the generator which will be transmitted
to grid through switchyard. The steam
after expansion in the turbine is
condensed
in
the
condenser
and
condens
ed steam is recycled back to the
boiler. The hot gases from the furnace
after loosing heat in different areas goes
through the Electrostatic Precipitators
(ESP) where ash is trapped. The clean gas
goes through the chimney.
1.14
Facilities for storage of
goods or
materials?
Yes
Temporary storage sheds are proposed.
1.15
Facilities for treatment or disposal
of solid waste or liquid effluents?
Yes
ETP and STP will be provided for
treatment of plant effluents and sewage
from plant. 100% dry ash handling
sys
tems are proposed for disposal of fly
ash (solid waste) in dry form.
1.16
Facilities for long term housing of
operational workers?
Yes
Existing colony with additional facilities
will be used for operational staff of
expansion unit.
7
1.17
New road
, rail or sea traffic
during construction or operation?
Yes
No rail or sea facilities are required.
Already roads are available to the
proposed project. Additional internal
roads required will be formed.
1.18
New road, rail, air, waterborne
or other
transport infrastructure
including new or altered routes
and stations, ports, airports etc?
Yes
As mentioned in the item 1.17
1.19
Closure or diversion of existing
transport routes or
infrastructure leading to
changes in traffic
mov
ements?
No
No Closure or diversions of existing
transport routes/infrastructure leading to
changes in traffic movements.
1.20
New or diverted transmission
lines or pipelines?
No
No New or diverted transmission
lines/pipelines
1.21
Impoundment, damming,
culverting, realignment or other
changes to the hydrology of
watercourses or aquifers?
No
No Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses/Aquifers.
1.22
Stream crossings?
No
No additional stream cross
ings in the
proposed expansion site.
1.23
Abstraction or transfers of water
from ground or surface waters?
Yes
Required water for the proposed unit will
be met from Godavari river near
Burgampadu through existing GRP pipe
link (approx. 26 km).
1.24
Chan
ges in water bodies or the
land surface affecting drainage or
run
-
off?
Yes
To a limited extent
1.25
Transport of personnel or materials
for construction, operation or
decommissioning?
Yes
Transportation is required for labour
from nearby villages and con
struction
materials for the project.
1.26
Long
-
term dismantling or
decommissioning or restoration
works?
No
No
Long
-
term
dismantling
or
decommissioning or restoration works.
1.27
Ongoing activity during
decommissioning which could
have an impact on the
e
nvironment?
No
Not envisaged
1.28
Influx of people to an area in
either temporarily or
permanently?
Yes
About 1000 labour during construction
will be employed. 100 Nos. of permanent
staff will work in the power plant during
operation stage.
1.29
In
troduction of alien species?
No
No Introduction of alien species
8
1.30
Loss of native species or genetic
diversity?
No
No loss of native species or genetic
diversity
1.31
Any other actions?
No
None
2)
Use of Natural resources for construction or ope
ration of the Project
(such as land,
water, materials or energy, especially any resources which are
non
-
renewable or in short supply)
Sl.
No
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates w
herever possible) with
source of information data
2.1
Land especially undeveloped
or agricultural land (ha)
Yes
Existing vacant land will be used for the
main plant. Agricultural land for ash
pond.
2.2
Water (expected source &
competing users)
unit:
KLD
Yes
Water requirement is 48,000 KLD and
will be met from Godavari river
2.3
Minerals (MT)
Yes
Raw material is coal: 12023
TPD
2.4
Construction material
Cement, steel, stone,
aggregates, sand/soil
(expected source
MT)
Yes
Cement: 16,500 MT
S
tructural Steel : 7,700 MT
Reinforcement Steel : 4,950 MT
Stone/Aggregate: 0.55 lakh cum (local)
Sand : 0.33 lakh cum (local)
2.5
Forests and timber
(Source
MT)
No
Not applicable
2.6
Energy including electricity
& fuels (source, comp
eting
users)
Unit: Fuel (MT)
Energy (MW)
Yes
Electricity required will be met from the
existing station.
2.7
Any other natural resources
(use appropriate standard
units)
Yes
Oil (1 ml/kwh) for start up and flame
stabilization.
9
3)
Use, storage, transport, handling or production of substances or materials
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health
4)
Production
of
solid
wastes
during
constru
ction
or
operation
or
decommissioning (MT/month)
Sl.
No
Information/
Checklist confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible) with
source of information data
4.1
Spoil, overburden or mine
wastes
Yes
Excavated soil during grading of the soil.
4.2
Ash/Municipal waste
(domestic and or
commercial wastes)
Yes
Ash generation: 4560
TPD(501 tph coal
with 38% ash)
Bottom Ash : 91
2
TPD
Fl
y ash: 36
48
TPD
Sl.
No
Information/
Checklist confirmation
Yes/
No
Details thereof (with approximate
Quantities/rates wherever possible) with
source of information data
3.1
Use of substances or materials,
which are hazardous (as per MSIHC
rules) to human health or
the
environment (flora, fauna, and water
supplies)
Yes
Furnace oil/HSD,
Chlorine, Alum, Caustic soda, HCL etc
will be used intermittently.
3.2
Changes in occurrence of disease
or affect disease vectors (e.g. insect
or water borne diseases)
No
No
Changes in occurrence of disease or
affect disease vectors.
3.3
Affect the welfare of people e.g. by
changing living conditions?
Yes
Improve living conditions of local people
3.4
Vulnerable groups of people who
could be affected by the project e.g.
hospital patients, children, the
elderly etc.,
No
The project is away from
Hospitals.
3.5
Any other causes
No
None
10
4.3
Hazardous wastes (as per
Hazardous Waste
Management Rules )
Yes
To limited extent.
However
The
Hazardous wastes generated from the
proposed project will be complied with
the hazardous wastes (management a
nd
handling) Rules with all the latest
amendments.
4.4
Other industrial process
wastes
No
There will not be any other industrial
process wastes generated from the
proposed plant except the wastes
mentioned in section 4.2.
4.5
Surplus product
No
There is
no surplus product generation.
4.6
Sewage sludge or other
sludge from effluent
treatment
Yes
Not significant.
4.7
Construction or demolition
waste
Yes
During construction some amount of
construction debris may be generated
which will be segrega
ted and whatever is
re
-
saleable will be sold to buyers and rest
of the waste will be used for filling up of
low lying areas and development of
internal roads and boundary walls
4.8
Redundant machinery or
equipment
Yes
Scrap
4.9
Contaminated soils or othe
r
materials
No
No Contaminated soils or other materials
are anticipated
4.10
Agricultural wastes
No
Not Envisaged
4.11
Other solid wastes
No
No other solid wastes except mentioned
in section 4.2.
5)
Release of pollutants or any hazardous, toxic or noxi
ous substances to air (Kg / hr)
Sl.
No
Information/Checklist
confirmation
Yes/
No
Details thereof (with
approximate quantities/rates wherever
possible) with source of information
data
5.1
Emissions from
combustion
of fossil fuels from
stationary or mobile sources
Yes
Flue gas emission:
Main stack
SPM: 100 mg/Nm
3
SO2:
5511 kg/hr (
for worst coal
consumption of 501 tph and sulphur 0.55%)
NOx: 1372 kg/hr
(flue gas volume: 635
Nm3/sec, NOx conc
: 600 mg/Nm3).
5.2
Emissions from production
processes
Yes
As mentioned in the item 5.1
5.3
Emissions from materials
Yes
Fugitive emissions to limited extent
11
handling including storage
or transport
5.4
Emissions from construction
activities i
ncluding plant and
equipment
Yes
Temporary
in
nature
which
may
originate
during
construction
of
buildings or roads, which will be taken
care by proper dust suppression by
sprinkling of water
5.5
Dust or odors from
handling of materials
including
construction
materials, sewage and waste
Yes
Dust generated due to handling of
construction material will be controlled
by sprinkling of water.
5.6
Emissions from incineration
of waste
No
No incineration is proposed
5.7
Emissions from burnin
g of
waste in open air (e.g. slash
materials, construction
debris)
No
No material will be openly burnt in air
5.8
Emissions from any other
sources
No
No emission from any other sources.
6) Generation of noise and vibration and emissions of Ligh
t and Heat:
Sl.
No
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible) with
source of information data
6.1
From operation of equipment
e.g. engines, ventilation
plant, crushers
Yes
Noise will g
enerate from Turbine &
Generator. Expected noise level is 90
dBA,
necessary PPEs (Ear Muffs, closed
chambers) will be provided for the
personnel working in those areas.
ii) Most of the equipment structures are
static. The vibration effect of these will be
only local and the design of supports and
foundations will nullify the intensity of
vibration.
iii) Light emissions are not envisaged in
the project.
iv) Heat emissions are not envisaged in
the project.
6.2
From industrial or similar
processes
No
As expla
ined in 6.1
6.3
From construction or
demolition
Yes
Excavation, drilling and welding which
are temporary in nature
6.4
From blasting or piling
Yes
Limited to construction area
6.5
From construction or
Yes
Limited

No comments: