Wednesday 3 January 2018

5
Sr. No.
Item
Details
24
Whether there is any litigation
pending against the project and/
or land in which the project is
propose to be set up
(a)
Name of the Court
(b)
Case No.
(c)
Orders/ directions of the
Court, if any and its
relev
ance with the proposed
project.
No
(II) Activity
1)
Construction, operation or decommissioning of the project involving actions,
which will cause physical changes in the locality (topography, land use, changes
in water bodies, etc.)
Sl.
No
Information/Chec
klist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible) with
source of information data
1.1
Permanent or temporary change
in land use, land cover or
topography including increase
in intensity of land use (w
ith
respect to local land use plan)
-
The proposed
1 X 800 MW Supercritical
Coal based Thermal Power plant
is an
extension to the existing plant. The
requirement of land will be much less due
to integration of facilities like coal
handling & water sy
stems with the other
stages of the plant.
137 acres of existing land will be used for
main plant and other facilities. Additional
230 acres will be acquired for ash pond for
existing and the proposed plants
.
1.2
Clearance of existing land,
vegetation a
nd buildings?
Yes
The existing vacant land will be levelled
and graded.
1.3
Creation of new land uses?
Yes
137 acres of existing land will be used for
main plant and other facilities. Additional
230 acres will be acquired for ash pond
for existing and
the proposed plants.
1.4
Pre
-
construction investing
-
ations
e.g. bore holes, soil testing?
No
Geological investigations will be Carried
out
1.5
Construction works?
Yes
Boiler, Turbine, Generator, Condenser,
Cooling water system, Coal handling
system,
Ash handling system, Coal plant,
ESPs, Switchyard and other civil,
mechanical and electrical plant and
equipment.
1.6
Demolition works?
No
---