Wednesday 3 January 2018

12
operational traffic
6.6
From lighting
or cooling
systems
Yes
Cooling Tower: 75 dB
(
A
)
6.7
From any other sources
No
None
7)
Risks of contamination of land or water from release of pollutants into the
ground or into sewers, surface waters, ground water, coastal waters or the sea
Sl.
No
Inf
ormation/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible)
with source of information data
7.1
From handling, storage, use or
spillage of hazardous materials
No
Spillages are limited to dyke area
7
.2
From discharge of sewage or
other effluents to water or the
land (expected mode and place of
discharge)
No
Treated sewage water will be used for
greenbelt
7.3
By deposition of pollutants
emitted to air into the land or
into water
No
The major emissions from the proposed
project are Particulate Matter (PM), SO
2
and NO
x
. Adequate control systems like
ESP and stack height meeting MOE&F
guidelines will be provided to control
the emissions. Hence, there will not be
any chance of significan
t contamination
of land and water by deposition of
pollutants emitted to air.
7.4
From any other sources
No
None
7.5
Is there a risk of long term build
up of pollutants in the
environment from these sources?
Yes
But within the prescribed limits by
prope
r Environment Management Plan
8)
Risk of accidents during construction or operation of the project, which could
affect human health or the environment
Sl.
No
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates
wherever possible)
with source of information data
8.1
From explosions, spillages, fires
etc from storage, handling, use or
production of hazardous
substances
No
Only minimum quantity of chemicals
required will be stored with in the plant
premises and sa
fety precautions will be
taken while handling.
13
8.2
From any other sources
No
None
8.3
Could the project be affected by
natural disasters causing
environmental damage (e.g.
floods, earthquakes, land slides,
cloudburst etc.)?
No
The project site is situat
ed in the
earthquake zone
-
III and earthquakes
occurrence are remote possibility.
14
9)
Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impac
ts with other existing or planned activities in the locality
Sl.
No
Information/
Checklist confirmation
Yes/
No
Details thereof (with approximate
quantities/rates wherever possible)
with source of information data
9.1
Lead to development of
supporting
facilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g
Housing development
Extractive industries
Supply industries
Others
No
Due to this project some positive
development is envisage
d, as the socio
-
economic conditions of the local
population will improve. However, the
impact on environment if any will be
controlled by proper EMP.
9.2
Lead to after
-
use of the site,
which could have an impact on
the environment
No
Not Envisaged
9.3
Set a precedent for later
developments
Yes
Development of local community
Im

sensitive for ecological reasons
-
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
No
Kinnerasani wild life s
anctuary
3
Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
No
----
4
Inland, coastal, marine or
underground waters
No
-----
5
State, National b
oundaries
No
-----
6
Routes or facilities used by the
public for access
to recreation or
other tourist, pilgrim areas
No
-----
7
Defence installations
No
-----
8
Densely populated or built
-
up
area
Yes
Kothagudem
10Km (SW)
9
Areas occupied by se
nsitive
man
-
made land uses
(hospitals,
schools, places of worship,
community facilities)
Yes
10
Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries,
tourism,
minerals)
No
------
11
Areas already subjected to
pollution or environmental
damage. (those where existing
legal environmental standards are
exceeded)
No
-------
12
Areas susceptible to natural
hazard which could cause the
project to
present environmental
problems
(earthquakes,
subsidence, landslides, erosion,
flooding
or extreme or adverse
climatic conditions)
No
-------

No comments: